Comprehensive engineering

Construction of a chemical etching and thermoprotective coating (MCrAIY & AI) removal workshop 

Location: OP “Kaluga”, LLC “RGT” 

Galvanic line for metalworking section with 
  integrated local treatment facilities within the workshop

Client: LLC "Russkie Gazovye Turbiny" (Russian Gas Turbines)

Project Company No. 1 is a specialized engineering company providing a full range of services in the field of water supply and sanitation, as well as industrial design

All rights reserved.  Reprinting and any use of materials is possible only if there is a link to the original source.

Мы используем файлы cookie

Используем чтобы улучшить работу сайта. Продолжая использовать сайт, вы соглашаетесь на обработку файлов cookie и политикой обработки персональных данных

We use cookies to improve the operation of the website. By continuing to use the site, you agree to the processing of cookies and the personal data processing policy.